Custom blending of construction mixtures

 

Development of the production line for building materials

 

 

In 2005, the company Trymat made a strategic decision concerning the expansion of its range of building material products and began construction on a line to produce building material. This was completed in 2007 and now operates in one-shift mode.


Design of the line

The line was designed differently from similarly oriented lines to meet the need for the flexibility and variability of production. The horizontal arrangement of silos was selected, whereby all large silos are set at one height level. The homogenizer is filled using a system of conveyor belts; for cement, limestone, etc., screw conveyors are used. This makes it easy to link up and add individual silos to the production process.


The automation of most processes on the line makes it possible to achieve the maximum inhibition of errors caused by human factors, which in turn ensures the maximum reliability of production.


Finally, the quality of our products is guaranteed by the ISO 9001 quality system and ISO 14001 environmental management system certified by Det Norske Veritas.